# The M48 Motorway (Severn Bridge Half Marathon) (Temporary Prohibition of Traffic) Order 2021, Article 2


In this Order:-
“the M48” means (i) the westbound carriageway of the M48 over the Severn Bridge from the tip of the nosing of the westbound exit slip road at Junction 1 to the tip of the nosing of the westbound entry slip road at Junction 2; and (ii) the eastbound carriageway of the M48 over the Severn Bridge from the tip of the nosing of the eastbound exit slip road at Junction 2 to the tip of the nosing of the eastbound entry slip road at Junction 1;
“the slip roads” mean (i) the eastbound entry slip road at M48 Junction 2; and (ii) the westbound entry slip road at M48 Junction 1;
“the tip of the nosing” means the first point where an entry slip road joins the carriageway of a motorway or the last point where an exit slip road leaves the carriageway of a motorway;
“event” means the Severn Bridge Half Marathon; and
“the event period” means a period of 5 hours starting at 07.30 hours on Sunday 29th August 2021.

---
Source: https://www.legislation.gov.uk/uksi/2021/947/article/2 (the official version)
Page: https://openlegislation.uk/m48-motorway-severn-bridge-half-marathon-temporary-prohibition-of-traffic-order-2021/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

