OpenLegislation

Article 2 Interpretation

Original text. Later amendments are not shown.

In this Order—

  • “the M48” means (1) the westbound carriageway of the M48 Motorway from a point 239 metres west of the tip of the nosing of the westbound entry slip road at Junction 1 (Aust) to a point 47 metres west of the mechanical joint at the western end of the M48 Severn Bridge; and, (2) the eastbound carriageway of the M48 Motorway from a point 47 metres west of the mechanical joint at the western end of the M48 Severn Bridge to a point 239 metres west of the tip of the nosing of the westbound entry slip road at Junction 1 (Aust).

  • “the works period” means the period starting at 00.01 hours on Monday 27th June 2022 and ending when the said works have been completed;

  • “the tip of the nosing” means the first point where an entry slip road joins the carriageway of a motorway or the last point where an exit slip road leaves the carriageway of a motorway;

    and a reference to an article followed by a number is a reference to the article in this Order which bears that number.