In this Order—

  • “the first length of the M48” means—

    1. (i)

      (i) the westbound carriageway of the M48 from a point 239 metres west of the tip of the nosing of the westbound entry slip road at M48 Junction 1 to a point 47 metres west of the mechanical joint at the western end of the M48 Severn Bridge; and

    2. (ii)

      (ii) the eastbound carriageway of the M48 from a point 47 metres west of the mechanical joint at the western end of the M48 Severn Bridge to a point 239 metres west of the tip of the nosing of the westbound entry slip road at M48 Junction 1

  • “the second length of the M48” means the westbound carriageway of the M48 from a point 239 metres west of the tip of the nosing of the westbound entry slip road at M48 Junction 1 to the mechanical joint at the eastern end of the M48 Severn Bridge;

  • “the slip road” means the westbound entry slip road at M48 Junction 1;

  • “tip of the nosing” means the first point where an entry slip road joins the carriageway of a motorway or the last point where an exit slip road leaves the carriageway of a motorway;

  • “the works” means works to remove the toll booths from the toll plaza area, resurfacing and associated maintenance works;

  • “the works period” means the period starting 20.00 hours on Saturday 1st December 2018 and ending when the said works have been completed;

  • “a works period” means a period of 10 hours starting at 20.00 hours on Saturday 1st December 2018 and on any subsequent day and ending when the said works have been completed.