# The M5 Junction 10 Development Consent Order 2025, Part 7: PUBLIC RIGHTS OF WAY

Extent: E+W

(1)
Area
(2)
Status and length of public right of way
Uckington Civil Parish, Tewkesbury PR49
309 metres of footpath to the north of the River Chelt, rerouting the existing footpath ref. AUC11 under the new River Chelt Bridge, as shown on sheet 15 of the streets, rights of way and access plans
Boddington Civil Parish, Tewkesbury PR50
104 metres of footpath to the south of the River Chelt, rerouting the existing footpath ref. ABO24 under the new River Chelt Bridge, as shown on sheet 15 of the streets, rights of way and access plans
Boddington Civil Parish, Tewkesbury PR12
275 metres of footpath to the west of M5 Junction 10 and to the south of the A4019, rerouting the existing footpath ref. ABO14, as shown on sheets 5 and 11 of the streets, rights of way and access plans
Boddington, Elmstone Hardwicke and Uckington Civil Parishes PR9
800 metres of bridleway from the existing bridleway ref. AUC1 to Withybridge Lane via the new A4019 underpass, as shown on sheets 5, 6 and 12 of the streets, rights of way and access plans
Uckington Civil Parish, Tewkesbury PR14
167 metres of footpath to the east of the existing bridleway ref. AUC1, as shown on sheet 12 of the streets, rights of way and access plans

---
Source: https://www.legislation.gov.uk/uksi/2025/795/schedule/3/part/7 (the official version)
Page: https://openlegislation.uk/m5-junction-10-development-consent-order-2025/schedule-3/part-7/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

