{
  "url": "https://openlegislation.uk/m5-junction-10-development-consent-order-2025/schedule-5",
  "json_url": "https://openlegislation.uk/m5-junction-10-development-consent-order-2025/schedule-5.json",
  "legislation": "uksi/2025/795",
  "legislation_title": "The M5 Junction 10 Development Consent Order 2025",
  "legislation_url": "https://openlegislation.uk/m5-junction-10-development-consent-order-2025",
  "path": "schedule/5",
  "kind": "schedule",
  "number": "5",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
  "text": "(1)\nPlot reference number shown on land plans\n(2)\nPurpose for which rights over land may be acquired\n(3)\nRelevant part of the authorised development\nLand Plans -Sheet 3\n3/2b\nNew right for temporary access for the construction of motorway signage and associated cabling and ducting works\n1a\nLand Plans -Sheet 4\n4/1c\nNew right for the construction of motorway signage and associated cabling and ducting works\nNew right for the construction of a new southbound exit slip from the M5 to the A4019\nNew right for the construction of a new northbound entry slip from the A4019 to the M5\nNew right for the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5\n1a, 1c, 1e, 1n\n4/1d\nNew right for the construction of a new southbound exit slip from the M5 to the A4019\nNew right for the construction of a new northbound entry slip from the A4019 to the M5\nNew right for an extension of the Leigh Brook culvert (also known as the Barn Farm culvert)\nNew right for the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5\nNew right for the construction of an environmental barrier adjacent to land housing a traveller site north of Junction 10 and east of the M5\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\n1c, 1e, 1m, 1n, 1o, 20\n4/3a\nNew right for the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5\nNew right for the diversion, use, maintenance and protection of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\n1n, 20\n4/3b\nNew right for the construction, use, protection, inspection and maintenance of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\n1n, 20\n4/3d\nNew right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation\n1c\n4/3e\nNew right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation\n1c\n4/3h\nNew right for the use of land northwest of Junction 10 as a construction compound\nNew right to provide, protect, inspect and maintain landscaping northwest of Junction 10\n1j, 2b\n4/4b\nNew right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation\n1c\nLand Plans -Sheets 5 and 5A\n5/1a(i)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n3d, 27\n5/2d\nNew right for the construction of motorway signage and associated cabling and ducting works\nNew right for the construction of a new southbound exit slip from the M5 to the A4019\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south)\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\nNew right for the demolition of the existing NRTS Transmission Station and associated infrastructure\n1a, 1c, 2, 2a, 2d, 15, 16, 27, 36a\n5/2h\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the realignment of the unclassified road known as Stanboro Lane\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n3, 3a, 10\n5/2h(i)\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the realignment of the unclassified road known as Stanboro Lane\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n3, 3a, 27\n5/2i\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n3, 10\n5/2j\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the realignment of the unclassified road known as Stanboro Lane\n3, 3a\n5/2k\nNew right for the realignment of the unclassified road known as Stanboro Lane\n3a\n5/2l\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the realignment of the unclassified road known as Stanboro Lane\n3, 3a\n5/2n\nNew right for the construction of a new northbound exit slip from the M5 to the A4019\nNew right for the construction of a new southbound entry slip from the A4019 to the M5\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south)\nNew right for the extension of the Piffs Elm culvert\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the diversion of telecommunication cable and associated apparatus and equipment\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC\nNew right for the demolition of the existing NRTS Transmission Station and associated infrastructure\n1b, 1d, 2, 2a, 2c, 2d, 3, 10, 19, 36a\n5/2o\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC\n2, 2d, 3, 19\n5/2p\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC\n2, 2d, 19\n5/2r\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the realignment of the unclassified road known as Stanboro Lane\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Distribution Limited PLC\n2, 3a, 19\n5/2y\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\n2, 2d\n5/2z\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\n2, 2d\n5/2aa\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\n2, 2d\n5/2cc\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\n2, 2d\n5/2ee\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the construction of an underpass west of Withybridge Lane\nNew right for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n2, 2d, 4, 4b, 4c, 10\n5/2gg\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n2, 2d, 4, 10\n5/2jj\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the construction of an underpass west of Withybridge Lane\nNew right for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4, 4b, 4c, 10\n5/2kk\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south)\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\nNew right for the demolition of the existing NRTS Transmission Station and associated infrastructure\n2, 2a, 10, 36a\n5/2mm\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n2, 10\n5/2ss\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4, 10\n5/2uu\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south)\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n2, 2a, 10\n5/3b\nNew right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation\n1c\n5/3c\nNew right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation\n1c\n5/4b\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4g, 15, 16, 27\n5/4b(i)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4g, 15, 16, 27\n5/4b(ii)\nNew right for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4c, 4g, 15, 16, 27\n5/4b(iii)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4g, 15, 16, 27\n5/4d(iv)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/4d(v)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/4d(vi)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/4d(vii)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/4d(viii)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/5a\nNew right for the demolition of Sheldon Nursery northwest of Junction 10\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\n2f, 3d, 19\n5/5b\nNew right for the construction compound no. 2 northwest of Junction 10\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\n1j, 19\n5/5g\nNew right for the realignment of the unclassified road known as Stanboro Lane\n3a\n5/6f\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\n2, 2d\n5/6g\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n2, 2d, 10\n5/6h\nNew right for the construction of a new grade separated roundabout junction and maintenance bays\nNew right for the demolition of the existing A4019 bridge over the M5\n2, 2d\n5/10d\nNew right for the provision, protection, inspection and maintenance of a flood compensation area at the location shown on sheets 5 and 11 of the works plans\n3e\n5/11b\nNew right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4c, 4g, 15, 16, 27\n5/31a(i)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/31b(i)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/31c(i)\nNew right for construction compound no. 3 northeast of Junction 10\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n1k, 4j\n5/31d\nNew right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4c, 4g, 15, 16, 27\n5/33c\nNew right for the temporary access for the construction of a new southbound exit slip from the M5 to the A4019 and new permanent right of access to provide, protect, inspect and maintain environmental and ecological mitigation\n1c\nLand Plans -Sheet 6\n6/1e\nNew right for the use of land southwest of Junction 10 at the location shown on sheets 5 and 6 of the works plans as construction compound no. 1\n1i\n6/1g\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019\n1b\n6/3a\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019\n1b\n6/3a(i)\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019\n1b\n6/3a(ii)\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019\n1b\n6/3a(iii)\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019\n1b\n6/10a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n\n6/11a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n\nLand Plans -Sheet 7\n7/1e\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new northbound exit slip from the M5 to the A4019\n1b\n7/3b\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new southbound entry slip from the A4019 to the M5\n1d\n7/3b(i)\nNew right to construct, use, protect, inspect and maintain the environmental mitigation associated with the construction of a new southbound entry slip from the A4019 to the M5\n1d\n7/3c\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/4a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/4b\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/4b(i)\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/4c(i)\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/4d\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/5a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/6a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/6b\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n7/7a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\nLand Plans - Sheet 10\n10/3b\nNew right for the construction of motorway signage and associated cabling and ducting works\n1a\n10/3b(i)\nNew right for the construction of motorway signage and associated cabling and ducting works\n1a\n10/3b(ii)\nNew right for the construction of motorway signage and associated cabling and ducting works\n1a\nLand Plans – Sheet 11\n11/1a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n3e\n11/1b\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n3e\n11/1c\nNew right to construct, use, protect, inspect and maintain a flood compensation area\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n3e, 28\n11/3a\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the diversion of a public right of way FP ABO14 to the south side of the A4019 (Tewkesbury Road)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n3, 3c, 3d, 10, 28\n11/3b\nNew right for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting\nNew right for the realignment of the unclassified road known as Stanboro Lane\nNew right for the diversion of telecommunication cable and associated apparatus and equipment\n3, 3a, 10\nLand Plans - Sheets 12 and 12A\n12/1b\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4i, 4j\n12/1b(i)\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4i, 4j\n12/1b(ii)\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4i, 4j\n12/1b(iii)\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4i, 4j\n12/1e\nNew right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4c, 4g, 15, 16, 27\n12/2b\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\n4i\n12/2b(i)\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\n4i\n12/2c\nNew right for the diversion, construction, use and maintenance of bridleway BR AUC1 under the A4019 (Tewkesbury Road)\nNew right for the construction of new or altered private means of access\nNew right for the construction of a public right of way (footpath) to link to diverted bridleway BR AUC1\nNew right for the diversion, use, protection, inspection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection, inspection and maintenance of telecommunication cable and associated apparatus and equipment\n4c, 4g, 4z, 15, 16, 27\n12/2k\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the use of land east of Withybridge Lane and west of new West Cheltenham Link Road as construction compound no. 5\n5, 5b\n12/2k(i)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the use of land east of Withybridge Lane and west of the new West Cheltenham Link Road as construction compound no. 5\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n5, 5b, 21\n12/2v\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction and use of a private means of access track to the east of the West Cheltenham Link Road\nNew right to construct, use, protect, inspect and maintain a flood compensation area\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n5, 5k, 5n, 21\n12/2w\nNew right to construct, use, protect, inspect and maintain a flood compensation area\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n, 5o\n12/2x\nNew right to construct, use, protect, inspect and maintain a flood compensation area\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n5n, 21\n12/6a\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4, 10\n12/7a\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\n4i\n12/7b\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no, 4\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4i, 4j\n12/7b(i)\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\n4i\n12/7b(ii)\nNew right for the use of land north of the A4019 (Tewkesbury Road) as construction compound no. 4\n4i\n12/7g\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n12/8b\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n12/9a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n\n12/9b\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n12/10a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n\n12/16a\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the diversion, use, provision and maintenance of telecommunication cable and associated apparatus and equipment\n4, 29\n12/16b\nNew right for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4, 29\nLand Plans – Sheets 13 and 13A\n13/1a\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/1a(i)\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/1e\nNew right for temporary access for the realignment and dualling for the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallegher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4, 4j\n13/1e(i)\nNew right for temporary access for the realignment and dualling for the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallegher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4, 4j\n13/1h\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\n4g, 15\n13/2b\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/2d\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/3o\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n23\n13/3w\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n4j, 23\n13/3w(i)\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/3z\nNew right to cleanse, widen, deepen and maintain the existing ditch outfall from the proposed attenuation pond\n4q\n13/6a\nNew right for the construction of service roads running east and west of The Green\nNew right for the diversion, use, protection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\n4n, 17, 22\n13/11a\nNew right for the construction of new or altered private means of access\nNew right for the construction of service roads running east and west of The Green\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4g, 4n,4j\n13/11b\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/12a\nNew right to construct, use, protect, inspect and maintain mitigation planting for dormice\n4j\n13/14a\nNew right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station\nNew right for the diversion, use, protection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection and maintenance of gas main for the benefit of Wales & West Utilities Limited\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4v, 15, 18, 24, 27, 32\n13/15a\nNew right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive; and the West Cheltenham Community Fire Station\n4v\n13/16a\nNew right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station\nNew right for the diversion, use, protection and maintenance of water pipeline for the benefit of Severn Trent Water Limited\nNew right for the diversion, use, protection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution PLC\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4v, 15, 24, 32\n13/17a\nNew right for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n4v, 32\n13A/1a\nNew right to cleanse, widen, deepen and maintain the existing ditch outfall from the proposed attenuation pond\n4q\n13A/2a\nNew right to cleanse, widen, deepen and maintain the existing ditch outfall from the proposed attenuation pond\n4q\nLand Plans – Sheet 14\n14/6a\nNew right for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay\nNew right for the diversion, use, protection and maintenance of gas main for the benefit of Wales & West Utilities\n4x, 18\nLand Plans – Sheet 15\n15/3c\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction of new or altered private means of access\nNew right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge\n5, 5k, 5e\n15/3d\nNew right to construct, use, protect, inspect and maintain a flood compensation area\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n, 5o\n15/4a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n5n\n15/4b\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge\n5, 5d, 5e\n15/4e\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge\n5, 5d, 5e\n15/4f\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge\n5d, 5e\n15/5b\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge\n5, 5d, 5e\n15/5b(i)\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\n5d\n15/6a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n15/7a\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\n5d\n15/8a\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge\n5, 5d, 5f\n15/8a(i)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\n5, 35\n15/8b\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge\n5, 5d, 5f\n15/8c\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environment mitigation\nNew right for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge\n5, 5d, 5f\n15/8c(i)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\n5, 5g\n15/8c(ii)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\n5, 5g, 35\n15/8c(iii)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\n5, 5g\n15/8c(iv)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\n5, 5g\n15/8c(v)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for the construction of new or altered private means of access\n5, 5k\n15/8k\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n15/8k(i)\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n15/8l\nNew right for the diversion, use, protection, inspection and maintenance of 170 metres of gas main for the benefit of Wales & West Utilities Limited\n35\n15/8m\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\n5g, 35\n15/8n\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\n5g, 35\n15/8p\nNew right for the use of land east of the new West Cheltenham Link Road as construction compound no. 7\nNew right for the diversion, use, protection, inspection and maintenance of gas main for the benefit of Wales & West Utilities Limited\n5g, 35\n15/9a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n15/10a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n15/10d\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n15/10e\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n15/10e(i)\nNew right for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation.\n5\n15/10e(ii)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\nLand Plans – Sheets 16 and 16A\n16/1a(i)\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/2a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/2b\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/2c\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/2d\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/2e\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/3a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/3c\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n16/3c(i)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n16/3e\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n16/3e(i)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n16/3e(ii)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\n5\n16/3e(iii)\nNew right of temporary access for the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) to join with the B4634 with footway and cycle track to the west and private access, signage and ducting, and new permanent rights to provide, protect, inspect, and maintain environmental and ecological mitigation\nNew right for working space for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting\n5, 6\n16/3i\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/3l\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/3o\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/4a\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/4b\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/4c\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/4d\nNew right to construct, use, protect, inspect and maintain a flood compensation area\n6d\n16/5d\nNew right for working space for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting\n6\n16/6b\nNew right for the construction of new or altered private means of access\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\nNew right for the diversion, use, protection and maintenance of telecommunication cable and associated apparatus and equipment\n6c, 8, 34\n16/6d\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n25\n16/8a\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n25\n16/10c\nNew right for the diversion, use, protection, inspection and maintenance of electric cable and associated apparatus and equipment for the benefit of National Grid Electricity Distribution plc\n26",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 5 in force at 25.6.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/795/schedule/5",
    "retrieved_at": "2026-10-28T21:13:57.234000+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}