The routes of the connecting roads are as follows:
(1)
A route to connect the eastbound carriageway of the M54 with the new trunk road at a new roundabout. The connecting road along this route is given the reference letter A on the plan.
(2)
A route to connect the westbound carriageway of the M54 with the new trunk road at a new roundabout. The connecting road along this route is given the reference letter B on the plan.