# The M54 to M6 Link Road Development Consent Order 2022, Part 3: PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED


(1)
Public right of way to be stopped up
(2)
Extent of stopping up
(3)
New highway to be substituted or provided
Shareshill 5 Footpath adjacent to Hilton Lane
Existing public right of way between point 5/2 and 5/4 on sheet 5 of the streets, rights of way and access plans
A new footpath between points 5/2 and 5/12 on sheet 5, footpath to utilise Hilton Lane footway between points 5/12 and 5/3 on sheet 5 and a new footpath between points 5/3 and 5/4 on sheet 5 of the streets, rights of way and access plans

---
Source: https://www.legislation.gov.uk/uksi/2022/475/schedule/4/part/3 (the official version)
Page: https://openlegislation.uk/m54-to-m6-link-road-development-consent-order-2022/schedule-4/part-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

