# The M54 to M6 Link Road Development Consent Order 2022, Part 6: PRIVATE MEANS OF ACCESS TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED


(1)
Private means of access to be stopped up
(2)
Extent of stopping up
(3)
New private means of access to be substituted or provided
Access track to Tower Hill Farm
Existing access track shown between points 4/5, 4/6 and 4/7 on sheet 4 of the streets, rights of way and access plans
Proposed new access from Featherstone Junction east roundabout from point 4/8 to point 4/9 on sheet 4 of the streets, rights of way and access plans
Access track to Hilton Park
Existing access track shown between points 4/10 and 4/11 on sheet 4 of the streets, rights of way and access plans
Proposed new access from Featherstone Junction east roundabout from point 4/11 to point 4/12 on sheet 4 of the streets, rights of way and access plans
Proposed Brookfield Farm overbridge access track
Between points 5/8 and 5/10 on sheet 5 of the streets, rights of way and access plans
Proposed new access from 5/8 to 5/9 and heading east from 5/9 to 5/7 and heading west from 5/9 to 5/10 on sheet 5 of the streets, rights of way and access plans

---
Source: https://www.legislation.gov.uk/uksi/2022/475/schedule/4/part/6 (the official version)