# The M60/M62/M66 Simister Island Interchange Development Consent Order 2025, Part 2: PUBLIC RIGHTS OF WAY

Extent: E+W

(1)
Public right of way
(2)
Extent
Footpath 28aPRE and 29aPRE, Simister/Heaton Park (Work No. 46)
91 metres of footpath (174 metres including retained) between points 3/1 and 3/A on Sheet 3 of the streets, rights of way and access plans
Footpath 9WHI, Simister (Work No. 40)
673 metres of footpath (757 metres including retained) around the Northern Loop between points 4/4 on Sheet 4 and 2/E on Sheet 2 of the streets, rights of way and access plans
Footpath 7WHI, Unsworth (Work No. 47)
91 metres of footpath (110 metres including retained) between points 4/2 and 4/B on Sheet 4 of the streets, rights of way and access plans

---
Source: https://www.legislation.gov.uk/uksi/2025/1018/schedule/3/part/2 (the official version)
Page: https://openlegislation.uk/m60m62m66-simister-island-interchange-development-consent-order-2025/schedule-3/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.