# The M60/M62/M66 Simister Island Interchange Development Consent Order 2025, Part 3: PRIVATE MEANS OF ACCESS

Extent: E+W

(1)
Road
(2)
Extent
Maintenance Access Track MA1, Simister (Work No. 29)
As shown between points 2/2 and 2/A on Sheet 2 of the streets, rights of way and access plans for a distance of 535 metres
Maintenance Access Track MA2, Simister (Work No. 35)
As shown between points 2/3 and 2/D on Sheet 2 of the streets, rights of way and access plans for a distance of 722 metres
Maintenance Access Track MA3, Simister (Work No. 53)
As shown between points 2/4 and 2/F on Sheet 2 of the streets, rights of way and access plans for a distance of 174 metres
Maintenance Access Track MA4, Simister (Work No. 14)
As shown between points 2/6 and 2/H on Sheet 2 of the streets, rights of way and access plans for a distance of 184 metres
Maintenance Access Track MA5, Simister/Heaton Park (Work No. 19)
As shown between points 3/2 and 3/B on Sheet 3 of the streets, rights of way and access plans for a distance of 231 metres
Maintenance Access Track MA6, Unsworth (Work No. 44)
As shown between points 4/1 and 4/A on Sheet 4 of the of the streets, rights of way and access plans for a distance of 152 metres

---
Source: https://www.legislation.gov.uk/uksi/2025/1018/schedule/3/part/3 (the official version)
Page: https://openlegislation.uk/m60m62m66-simister-island-interchange-development-consent-order-2025/schedule-3/part-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.