# The M60/M62/M66 Simister Island Interchange Development Consent Order 2025, Part 2: PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

Extent: E+W

(1)
Public right of way to be stopped up
(2)
Extent of stopping up
(3)
New public right of way to be substituted or provided
Footpath 28aPRE and 29aPRE, Simister/Heaton Park (Work No. 46)
198 metres of Footpath PR2 to be stopped up shown on Sheet 3 of the streets, rights of way and access plans
91 metres of footpath (174 metres including retained) between points 3/1 and 3/A on Sheet 3 of the streets, rights of way and access plans
Footpath 9WHI, Simister (Work No. 40)
757 metres of Footpath PR1 to be stopped up shown on Sheet 2 of the streets, rights of way and access plans
673 metres of footpath (757 metres including retained) around the Northern Loop between point 4/4 on Sheet 4 and point 2/E shown on Sheet 2 of the streets, rights of way and access plans
Footpath 7WHI, Unsworth (Work No. 47)
60 metres of Footpath PR3 to be stopped up shown on Sheet 4 of the streets, rights of way and access plans
91 metres of footpath (110 metres including retained) between points 4/2 and 4/B shown on sheet 4 of the streets, rights of way and access plans

---
Source: https://www.legislation.gov.uk/uksi/2025/1018/schedule/4/part/2 (the official version)