  "url": "https://openlegislation.uk/m60m62m66-simister-island-interchange-development-consent-order-2025/schedule-7",
  "json_url": "https://openlegislation.uk/m60m62m66-simister-island-interchange-development-consent-order-2025/schedule-7.json",
  "legislation": "uksi/2025/1018",
  "legislation_title": "The M60/M62/M66 Simister Island Interchange Development Consent Order 2025",
  "legislation_url": "https://openlegislation.uk/m60m62m66-simister-island-interchange-development-consent-order-2025",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nPlot reference Number shown on Land Plans\n(2)\nPurpose for which temporary possession may be taken\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet 1\n1/1e\nRequired to provide a working area for improving the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 03, 48 and 49 as shown on sheets 1 and 2 of the works plans\n1/1f\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 02, 45 and 48 as shown on sheets 1 and 2 of the works plans\n1/1g\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/1j\nRequired to provide a working area for improving the carriageway of the M60 and utilities diversions\nWork No. 50 as shown on sheet 1 of the works plans\n1/3c\nRequired to provide a working area for improving the carriageway of the M60 and utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/3d\nRequired to provide a working area for improving the carriageway of the M60 and utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/3e\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 03, 48 and 49 as shown on sheets 1 and 2 of the works plans\n1/3f\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/3h\nRequired for utilities diversions\nWork No. 50 as shown on sheet 1 of the works plans\n1/5a\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5b\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5c\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5d\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5e\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5f\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5g\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5h\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5i\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5j\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5k\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5l\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5m\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5n\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5o\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5p\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5q\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5r\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5s\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5t\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5u\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5v\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5w\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5x\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5y\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5z\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aa\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ab\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ac\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ad\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ae\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5af\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ag\nRequired to provide a working area for improving the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 02, 45 and 48 as shown on sheets 1 and 2 of the works plans\n1/5ah\nRequired for utilities diversions\nWork No. 45 as shown on sheet 1 of the works plans\n1/5ai\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aj\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ak\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5al\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5am\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5an\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ao\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ap\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aq\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 03 and 49 as shown on sheets 1 and 2 of the works plans\n1/5ar\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5as\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 03 and 49 as shown on sheets 1 and 2 of the works plans\n1/5at\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5au\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5av\nRequired for utilities diversions\nWork Nos. 45 and 48 as shown on sheet 1 of the works plans\n1/5aw\nRequired for utilities diversions\nWork Nos. 45 and 48 as shown on sheet 1 of the works plans\n1/5ax\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5ay\nRequired for utilities diversions\nWork Nos. 48 and 49 as shown on sheet 1 of the works plans\n1/5az\nRequired for utilities diversions\nWork Nos. 48 and 49 as shown on sheet 1 of the works plans\n1/5aaa\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aab\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aac\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aad\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aae\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/5aaf\nRequired for utilities diversions\nWork Nos. 48 and 49 as shown on sheet 1 of the works plans\n1/6a\nRequired for utilities diversions\nWork No. 49 as shown on sheet 1 of the works plans\n1/6d\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 02 as shown on sheets 1 and 2 of the works plans\n1/7\nRequired for utilities diversions\nWork No. 45 as shown on sheet 1 of the works plans\n1/8a\nRequired for utilities diversions\nWork Nos. 45 and 48 as shown on sheet 1 of the works plans\n1/8b\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/9\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions\nWork Nos. 03, 48 and 49 as shown on sheets 1 and 2 of the works plans\n1/10\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/11\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/12\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/13\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/14a\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/14b\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/14c\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/15\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/16\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/17a\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/17b\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/17c\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/17d\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/17e\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/18a\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/18b\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/18c\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/19\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/20\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/22a\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/22b\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/23\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 03 as shown on sheets 1 and 2 of the works plans\n1/24\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/25\nRequired to provide a working area for widening g the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/26\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/27\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/28\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/29\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/30\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/31a\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/31b\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/32\nRequired to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation\nWork Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans\n1/33a\nRequired to provide a working area for widening the carriageway of the M60 and installing gantries\nWork No. 02 as shown on sheets 1 and 2 of the works plans\nLand Plans – Sheet 2\n2/1e\nRequired for provision of a temporary construction compound\nAll works\n2/2\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13, 14, 15, and 16 as shown on sheets 1, 2 and 3 of the works plans\n2/3a\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13, 14, 15, and 16 as shown on sheets 1, 2 and 3 of the works plans\n2/3c\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13 and 14 as shown on sheets 1, 2 and 3 of the works plans\n2/4a\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13, 14, 15, and 16 as shown on sheets 1, 2 and 3 of the works plans\n2/5a\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and environmental mitigation\nWork Nos. 02, 05, 06, 09, 10, 27, 29 and 57 as shown on sheets 1 and 2 of the works plans\n2/5b\nRequired for provision of a temporary construction compound\nAll works\n2/5e\nRequired for provision of a temporary construction compound\nAll works\n2/5i\nRequired for provision of a temporary construction compound\nAll works\n2/6\nRequired for utilities diversions\nWork No. 52 as shown on sheet 2 of the works plans\n2/7a\nRequired for utilities diversions\nWork No. 52 as shown on sheet 2 of the works plans\n2/7b\nRequired for utilities diversions\nWork No. 52 as shown on sheet 2 of the works plans\n2/8b\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13 and 14 as shown on sheets 1, 2 and 3 of the works plans\n2/8e\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation, environmental mitigation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13, 14, 15, 16, 17, 25, 51 and 58 as shown on sheets 1, 2 and 3 of the works plans\n2/11\nRequired to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation, environmental mitigation and utilities diversions\nWork Nos. 03, 07, 08, 11, 12, 13, 14, 15, 16, 17, 25, 51 and 58 as shown on sheets 1, 2 and 3 of the works plans\n2/12\nRequired for utilities diversions\nWork No. 51 as shown on sheet 2 of the works plans\n2/16f\nRequired to provide access for landscaping works drainage attenuation and environmental mitigation\nWork Nos. 37 and 38 as shown on sheet 2 of the works plans\nLand Plans – Sheet 4\n4/8b\nRequired for provision of a temporary construction compound and material storage area\nWork Nos. 43, 44 and 47 as shown on sheet 4 of the works plans",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 in force at 30.9.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1018/schedule/7",
    "retrieved_at": "2026-10-28T21:11:37.221967+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}