# The M60/M62/M66 Simister Island Interchange Development Consent Order 2025, Schedule 7: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W

(1)
Plot reference Number shown on Land Plans
(2)
Purpose for which temporary possession may be taken
(3)
Relevant part of the authorised development
Land Plans – Sheet 1
1/1e
Required to provide a working area for improving the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 03, 48 and 49 as shown on sheets 1 and 2 of the works plans
1/1f
Required to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 02, 45 and 48 as shown on sheets 1 and 2 of the works plans
1/1g
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/1j
Required to provide a working area for improving the carriageway of the M60 and utilities diversions
Work No. 50 as shown on sheet 1 of the works plans
1/3c
Required to provide a working area for improving the carriageway of the M60 and utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/3d
Required to provide a working area for improving the carriageway of the M60 and utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/3e
Required to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 03, 48 and 49 as shown on sheets 1 and 2 of the works plans
1/3f
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/3h
Required for utilities diversions
Work No. 50 as shown on sheet 1 of the works plans
1/5a
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5b
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5c
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5d
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5e
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5f
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5g
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5h
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5i
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5j
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5k
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5l
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5m
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5n
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5o
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5p
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5q
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5r
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5s
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5t
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5u
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5v
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5w
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5x
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5y
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5z
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aa
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ab
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ac
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ad
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ae
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5af
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ag
Required to provide a working area for improving the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 02, 45 and 48 as shown on sheets 1 and 2 of the works plans
1/5ah
Required for utilities diversions
Work No. 45 as shown on sheet 1 of the works plans
1/5ai
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aj
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ak
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5al
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5am
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5an
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ao
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ap
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aq
Required to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 03 and 49 as shown on sheets 1 and 2 of the works plans
1/5ar
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5as
Required to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 03 and 49 as shown on sheets 1 and 2 of the works plans
1/5at
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5au
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5av
Required for utilities diversions
Work Nos. 45 and 48 as shown on sheet 1 of the works plans
1/5aw
Required for utilities diversions
Work Nos. 45 and 48 as shown on sheet 1 of the works plans
1/5ax
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5ay
Required for utilities diversions
Work Nos. 48 and 49 as shown on sheet 1 of the works plans
1/5az
Required for utilities diversions
Work Nos. 48 and 49 as shown on sheet 1 of the works plans
1/5aaa
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aab
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aac
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aad
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aae
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/5aaf
Required for utilities diversions
Work Nos. 48 and 49 as shown on sheet 1 of the works plans
1/6a
Required for utilities diversions
Work No. 49 as shown on sheet 1 of the works plans
1/6d
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 02 as shown on sheets 1 and 2 of the works plans
1/7
Required for utilities diversions
Work No. 45 as shown on sheet 1 of the works plans
1/8a
Required for utilities diversions
Work Nos. 45 and 48 as shown on sheet 1 of the works plans
1/8b
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/9
Required to provide a working area for widening the carriageway of the M60, installing gantries and utilities diversions
Work Nos. 03, 48 and 49 as shown on sheets 1 and 2 of the works plans
1/10
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/11
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/12
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/13
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/14a
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/14b
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/14c
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/15
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/16
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/17a
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/17b
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/17c
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/17d
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/17e
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/18a
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/18b
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/18c
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/19
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/20
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/22a
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/22b
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/23
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 03 as shown on sheets 1 and 2 of the works plans
1/24
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/25
Required to provide a working area for widening g the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/26
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/27
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/28
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/29
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/30
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/31a
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/31b
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/32
Required to provide a working area for widening the carriageway of the M60, installing gantries and environmental mitigation
Work Nos. 02, 54 and 55 as shown on sheets 1 and 2 of the works plans
1/33a
Required to provide a working area for widening the carriageway of the M60 and installing gantries
Work No. 02 as shown on sheets 1 and 2 of the works plans
Land Plans – Sheet 2
2/1e
Required for provision of a temporary construction compound
All works
2/2
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13, 14, 15, and 16 as shown on sheets 1, 2 and 3 of the works plans
2/3a
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13, 14, 15, and 16 as shown on sheets 1, 2 and 3 of the works plans
2/3c
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13 and 14 as shown on sheets 1, 2 and 3 of the works plans
2/4a
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13, 14, 15, and 16 as shown on sheets 1, 2 and 3 of the works plans
2/5a
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and environmental mitigation
Work Nos. 02, 05, 06, 09, 10, 27, 29 and 57 as shown on sheets 1 and 2 of the works plans
2/5b
Required for provision of a temporary construction compound
All works
2/5e
Required for provision of a temporary construction compound
All works
2/5i
Required for provision of a temporary construction compound
All works
2/6
Required for utilities diversions
Work No. 52 as shown on sheet 2 of the works plans
2/7a
Required for utilities diversions
Work No. 52 as shown on sheet 2 of the works plans
2/7b
Required for utilities diversions
Work No. 52 as shown on sheet 2 of the works plans
2/8b
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13 and 14 as shown on sheets 1, 2 and 3 of the works plans
2/8e
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation, environmental mitigation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13, 14, 15, 16, 17, 25, 51 and 58 as shown on sheets 1, 2 and 3 of the works plans
2/11
Required to provide a working and material storage area for widening the carriageway of the M60 and installing gantries, temporary haul routes, drainage attenuation, environmental mitigation and utilities diversions
Work Nos. 03, 07, 08, 11, 12, 13, 14, 15, 16, 17, 25, 51 and 58 as shown on sheets 1, 2 and 3 of the works plans
2/12
Required for utilities diversions
Work No. 51 as shown on sheet 2 of the works plans
2/16f
Required to provide access for landscaping works drainage attenuation and environmental mitigation
Work Nos. 37 and 38 as shown on sheet 2 of the works plans
Land Plans – Sheet 4
4/8b
Required for provision of a temporary construction compound and material storage area
Work Nos. 43, 44 and 47 as shown on sheet 4 of the works plans

---
Source: https://www.legislation.gov.uk/uksi/2025/1018/schedule/7 (the official version)
Page: https://openlegislation.uk/m60m62m66-simister-island-interchange-development-consent-order-2025/schedule-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.