Section 2
In this Scheme:
all measurements of distance are measured along the route of the relevant highway:
-
“connecting road” means a special road along a route described in the Schedule to this Scheme;
-
“the plan” means the deposited site plan marked “The M62 Motorway (Junction 6 Improvements) (Connecting Roads) Scheme 2007”, signed by authority of the Secretary of State for Transport and deposited at ODPM-DfT Records Management Branch, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA; and
-
“the special roads” means each connecting road.