# The M8 and M9 Trunk Roads (Newbridge to Hermiston Gait) (Actively Managed Hard Shoulder and Speed Limit) Regulations 2021, Introduction: Introductory text


Road Traffic
Made 26th January 2021
Laid before the Scottish Parliament 28th January 2021
Coming into force 18th March 2021
The Scottish Ministers make the following Regulations in exercise of the powers conferred by section 17(2), (3) and (3ZA) of the Road Traffic Regulation Act 1984 and all other powers enabling them to do so.
In accordance with section 134(8) of that Act, they have consulted with such representative organisations as they think fit.

---
Source: https://www.legislation.gov.uk/ssi/2021/43/introduction (the official version)
Page: https://openlegislation.uk/m8-and-m9-trunk-roads-newbridge-to-hermiston-gait-actively-managed-hard-shoulder-and-speed-limit-regulations-2021/introduction