# The Mallard Pass Solar Farm Order 2024, Article 13: Access to works

Extent: E+W

(1) The undertaker may, for the purposes of the authorised development and in connection with the authorised development—
(a) form and lay out the permanent means of access, or improve existing means of access, in the locations specified in Schedule 7 (access to works); and
(b) with the approval of the relevant planning authority after consultation with the highway authority in such a form as reasonably required by the highway authority, form and lay out such other means of access or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.
(2) Paragraph (1)(b) does not apply if the relevant planning authority has already provided detailed design approval pursuant to requirement 6(1) of Schedule 2 (requirements) for the access sought to be formed and lay out pursuant to paragraph (1)(b).

---
Source: https://www.legislation.gov.uk/uksi/2024/796/article/13 (the official version)