  "url": "https://openlegislation.uk/mallard-pass-solar-farm-order-2024/schedule-1/paragraph-2",
  "json_url": "https://openlegislation.uk/mallard-pass-solar-farm-order-2024/schedule-1/paragraph-2.json",
  "legislation": "uksi/2024/796",
  "legislation_title": "The Mallard Pass Solar Farm Order 2024",
  "legislation_url": "https://openlegislation.uk/mallard-pass-solar-farm-order-2024",
  "path": "schedule/1/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Authorised development",
  "text": "In the District of South Kesteven and in the County of Rutland a nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act and associated development under section 115(1)(b) of the 2008 Act.\nThe nationally significant infrastructure project comprises the following works—\nWork No. 1— a ground mounted solar photovoltaic generating station with a gross electrical output capacity of over 50 megawatts including—\n(a)PV modules fitted to mounting structures;\n(b)inverters;\n(c)transformers;\n(d)switch gear; and\n(e)electrical cables.\nThe associated development within the meaning of section 115(2) of the 2008 Act includes —\nWork No. 2— works in connection with an onsite substation including—\n(a)substation, switch room buildings and ancillary equipment including reactive power units;\n(b)control building housing offices, storage, welfare facilities, parking areas and access;\n(c)workshop, store and ancillary structures;\n(d)monitoring and control systems for this Work No. 2 and Work No. 1 housed within the control building in Work No. 2(b) or located separately in their own containers or control rooms; and\n(e)harmonic filters.\nWork No. 3— works to lay high voltage electrical cables, access and temporary construction compound laydown areas for the electrical cables, to connect to the existing Ryhall substation including—\n(a)Work No. 3A – works to lay electrical cables including 400 kilovolt cable connecting Work No. 2 to the existing substation; and\n(b)Work No. 3B – temporary construction compound laydown areas for the purposes of Work No. 3A.\nWork No. 4— works to lay electrical cables including electrical cables connecting Work No. 1 to Work No. 2.\nWork No. 5— temporary construction and decommissioning compound and laydown areas including—\n(a)areas of hardstanding;\n(b)HGV, vehicle and cycle parking;\n(c)site and welfare offices, canteens and workshops;\n(d)area to store materials and equipment;\n(e)storage and waste skips;\n(f)area for download and turning;\n(g)security infrastructure, including cameras, perimeter fencing and lighting;\n(h)site drainage and waste management infrastructure (including sewerage); and\n(i)electricity, water and telecommunications connections.\nWork No. 6— works to facilitate access to Work Nos. 1 to 5 including—\n(a)creation of accesses from the public highway;\n(b)creation of visibility splays;\n(c)removal of vegetation;\n(d)works to widen and surface the streets; and\n(e)making and maintaining passing places.\nWork No. 7— works to create, enhance and maintain green infrastructure, including—\n(a)landscape and biodiversity mitigation and enhancement areas;\n(b)habitat creation and management, including earthworks, landscaping, means of enclosure, and the laying and construction of drainage infrastructure; and\n(c)laying down of permissive paths, signage and information boards.\nIn connection with and in addition to Work Nos. 1 to 7 further associated development within the Order limits comprising such other works or operations as may be necessary or expedient for the purposes of or in connection with the authorised development and insofar as they do not give rise to any materially new or materially different environmental effects from those assessed in the environmental statement, including—\n(a)fencing, gates, boundary treatments and other means of enclosure;\n(b)bunds, embankments, trenching and swales;\n(c)works, improvements or extensions to the existing drainage and irrigation system and works to alter the position and extent of such irrigation system;\n(d)irrigation infrastructure, surface water drainage systems, runoff outfalls, SuDs Ponds, storm water attenuation systems including storage basins, oil water separators, including channelling and culverting and works to existing drainage networks;\n(e)electrical, gas, water, foul water drainage and telecommunications infrastructure connections, diversions and works to, and works to alter the position of, such services and utilities connections;\n(f)works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses;\n(g)works for the provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, lightning protection masts, weather stations, storage containers, communication infrastructure, and perimeter fencing;\n(h)improvement, maintenance, repair and use of existing streets, private tracks and access roads;\n(i)laying down, maintenance and repair of new internal access tracks, ramps, means of access, cycle routes and roads, signage and information boards;\n(j)temporary footpath diversions;\n(k)landscaping;\n(l)temporary storage of materials prior to installation;\n(m)site establishments and preparation works including site clearance (including vegetation removal, demolition of existing buildings and structures); earthworks (including soil stripping and storage and site levelling) and excavations; the alteration of the position of services and utilities; and works for the protection of buildings and land; and\n(n)tunnelling, boring and drilling works.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Sch. 1 substituted (1.11.2024) by The Mallard Pass Solar Farm (Correction) Order 2024 (S.I. 2024/1088), art. 1(2), Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 para. 2 in force at 3.8.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/796/schedule/1/paragraph/2",
    "retrieved_at": "2026-10-28T21:28:01.809186+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}