# The Mallard Pass Solar Farm Order 2024, Part 2: TEMPORARY USE OF MOTOR VEHICLES ON PUBLIC RIGHT OF WAY

Extent: E+W

(1)
Area
(2)
Road name, number and length
(3)
Measures
Rutland County Council
Public Right of Way – E–169 between the points marked MV–A1 and MV–A2 on sheet 2 of the access and rights of way plans
Motor vehicles under the direction of the undertaker may pass along, or cross, the length of the public right of way
Rutland County Council
Public Right of Way – BrAW/1/1 between the points marked MV–B1 and MV–B2 on sheet 3 of the access and rights of way plans
Motor vehicles under the direction of the undertaker may pass along, or cross, the length of the public right of way
Rutland County Council and Lincolnshire County Council
Public Right of Way – BrAW/1/1 between the points marked MV–C1 and MV–C2 on sheet 3 of the access and rights of way plans
Motor vehicles under the direction of the undertaker may pass along, or cross, the length of the public right of way

---
Source: https://www.legislation.gov.uk/uksi/2024/796/schedule/6/part/2 (the official version)