A harbour arm comprising—

(a)

a bund commencing at point E on the deposited plan (being a point 194 metres from the base of the existing lighthouse) by a junction with the existing quay wall of the harbour at its southern end, passing north-west for a distance of 82 metres to point F on the deposited plan, then passing in a northerly direction for a distance of 103 metres to point G on the deposited plan and there terminating;

(b)

a retaining wall commencing at point M (being a point 188 metres from the base of the existing lighthouse) on the deposited plan by a junction with the said quay wall, passing north-north-west for a distance of 100 metres to a point L on the deposited plan, then passing due north for a distance of 48 metres to point K on the deposited plan and there terminating;

(c)

a quay wall commencing at points G-K on the deposited plan by a junction with the bund and retaining wall, passing north-east for a distance of 70 metres to point J on the deposited plan and there terminating 83 metres north-east of the seaward end of the Stone Pier; and

(d)

a reclamation area between the bund and retaining wall within points E, F, G, K, L and M on the deposited plan.

  1. 9Power to construct, etc., works
  2. 10Power to make subsidiary works
  3. 11Power to deviate
  4. 12Power to dredge
  5. 13Fine for obstructing works
  6. 14Tidal works not to be executed without approval of Secretary of State
  7. 15Provision against danger to navigation
  8. 16Abatement of works abandoned or decayed
  9. 17Survey of tidal works
  10. 18Permanent lights on tidal work
  11. 19Lights on tidal works during construction