Article 3 Power to construct and maintain works
The Council may construct and maintain the scheduled works.
Subject to article 4, the scheduled works shall be constructed in the lines or situations shown on the works plan and in accordance with the levels shown on the deposited sections.
Subject to paragraphs (5) to (8), the Council may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, in connection with or in consequence of, the construction of the scheduled works, namely—
buildings on the stone pier, including or incorporating shops, reception areas, refreshment facilities, educational facilities and other facilities;
the provision of access to or from the scheduled works;
temporary or permanent landing places, jetties or moorings or other means of accommodating vessels in the construction or maintenance of the scheduled works;
buoys, beacons, fenders and other navigational warning or ship impact protection works;
works to alter the position of apparatus, including mains, sewers, drains and cables;
landscaping and other works to mitigate any adverse effects of the construction, maintenance, use or operation of the other authorised works; and
works for the benefit or protection of land affected by the authorised works.
Subject to paragraph (6), the Council may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, in connection with or in consequence of, the construction of the scheduled works.
Paragraphs (3)(a), (f) and (g) shall only authorise the carrying out or maintenance of works within the limits of deviation.
Paragraph (3)(b) and (4) shall only authorise the carrying out and maintenance of works on the stone pier.
Paragraph (3)(c) and (d) shall only authorise the carrying out and maintenance of works within such part of the Order limits as lies below the level of mean high water springs.
Paragraph (3)(e) shall only authorise the carrying out or maintenance of works within the Order limits.