Schedule 1 SCHEDULED WORKS
In the District of Thanet—
An extension to the stone pier comprising the following—
-
Work No. 1A
-
An enclosed building with a width of 20 metres, commencing at grid reference E635223.881, N171275.103 and extending in a south-easterly direction for a distance of 55 metres and terminating at grid reference E635271.508, N171252.731 to be used for the purposes of an art gallery or other commercial or leisure purposes;
-
Work No. 1B
-
A vehicular and pedestrian bridge structure linking the said stone pier or any building constructed on the stone pier to Work No. 1A;
-
Work No. 2
-
Mitigation works for birds consisting of an apron of solid construction bound by an imaginary line commencing on the existing sea wall to the south of the stone pier at grid reference E635334.991, N171194.154, thence in a curved and then straight line for 58 metres in a south-westerly and then southerly direction to grid reference E635322.709, N171160.539, thence in a straight line for 18 metres in an easterly direction to grid reference E635340.44, N171163.64 on the said sea wall and thence along the edge of the sea wall for 31 metres in a northerly direction terminating at the said grid reference E635334.991, N171194.154.