Regulation 5 Amendment of the Schedule
In the Schedule—
(a)
in the heading, delete “(“CAPS”)”;
(b)
in the shoulder note, for “Regulation 4(3)” substitute “Regulation 4(2)”; and
(c)
for paragraph 1 substitute—
“1.The bands and (where applicable) maximum fees are as follows—
Band Description of application Maximum fee Band 1 Any application relating to:
- (a)
the burial of a body at sea;
- (b)
erecting scaffolding for discrete maintenance projects;
- (c)
removing poles, girders, joists and objects of a similar nature unattached to the seabed or any structure;
- (d)
resurfacing a slipway;
- (e)
repairing joints of any structure; or
- (f)
any activity of a similarly minor nature
£50 Band 2 Any application which does not fall, or does not fall exclusively, within the description in Band 1 and relates to a specified activity or activities which has, or (in the case of more than one activity) taken together have, an estimated cost falling within one of the following ranges— Band 2A less than £50,000 £1,400 Band 2B £50,000 or more, but less than £1,000,000 £2,200 Band 3 Any application which does not fall, or does not fall exclusively, within the description in Band 1 and does not fall within the description in Band 2A or 2B None ”.