Paragraph 14

Original text. Later amendments are not shown.

(1)

If, during the construction of a specified work or within 10 years after the completion of such work there is created an accumulation or erosion or alteration of the tidal flow or littoral drift which causes damage, or reasonable expectation of damage, the Authority, if so required by the Agency before or within the period of 10 years after such completion, shall, remedy such accumulation, erosion or alteration of tidal flow or littoral drift, in the manner specified in sub-paragraph (4) and , if they refuse or fail so to do, the Agency may itself cause the work to be done and may recover the reasonable cost thereof from the Authority.

(2)

Should any accumulation or erosion or alteration of the tidal flow or littoral drift which causes damage or reasonable expectation of damage, arise in consequence of such construction within the said period of 10 years and be remedied in accordance with sub-paragraph (1), any recurrence of such accumulation or erosion or alteration of the tidal flow or littoral drift shall from time to time be so remedied by the Authority during the said period of 10 years and at any time thereafter, save that the Authority’s obligation under this paragraph shall cease in the event that following the remedying of any accumulation or erosion or alteration of the tidal flow or littoral drift a period of 10 years elapses without any further accumulation or erosion or alteration of the tidal flow or littoral drift caused or created in consequence of such construction.

(3)

In sub-paragraphs (1) and (2), “damage” means any damage to the bed or banks of a river or any adverse effect upon the structure or operation of any outfall, flood or sea defences or any jetty or other structure under the jurisdiction of the Agency for the purposes of the Water Resources Act 1991.

(4)

For the purposes of sub-paragraphs (1) and (2)—

(a)

in the case of an accumulation, the remedy shall be its removal or such other protective works or measures as may be reasonably required by the Agency; and

(b)

in the case of erosion or alteration of tidal flow or littoral drift, the remedy shall be the carrying out of such reconstruction works and other protective works or measures as may be reasonably required by the Agency.

(5)

In the event that surveys, inspection, tests or sampling establish that such accumulation or erosion or alteration of tidal flow or littoral drift would have been caused in any event by factors other than the construction of a specified work the Authority shall be liable to remedy such accumulation or erosion or alteration of tidal flow or littoral drift only to the extent that the same is attributable to such construction.