{
  "url": "https://openlegislation.uk/meaford-gas-fired-generating-station-order-2016/schedule-2/paragraph-3",
  "json_url": "https://openlegislation.uk/meaford-gas-fired-generating-station-order-2016/schedule-2/paragraph-3.json",
  "legislation": "uksi/2016/779",
  "legislation_title": "The Meaford Gas Fired Generating Station Order 2016",
  "legislation_url": "https://openlegislation.uk/meaford-gas-fired-generating-station-order-2016",
  "path": "schedule/2/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Detailed design",
  "text": "(1) The authorised development must be carried out in accordance with—\n(a) the approved plans listed in Table 1 below inclusive of any limits of deviation; and\n(b) any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 19(1))—\nTable 1\nworks plans\nSubmission document reference number 2.3\naccess rights of way plan\nSubmission document reference number 2.4\n(2) The authorised development must not exceed the maximum parameters specified in Table 2 and Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 19(1))—\nTable 2\n(1)\nElement of authorised development\n(2)\nMaximum height\n(metres) above a site level of approximately 99 metres AOD\n(3)\nMaximum width\n(metres)\n(4)\nMaximum length\n(metres)\n(5)\nOther parameters\nGas turbine building (part of numbered work 1A)\n25 metres\n45 metres\n60 metres\nMaximum height 124m AOD\nEach Heat Recovery Steam Generator Building (part of numbered work 1A)\n35 metres\n13 metres\n25 metres\nMaximum height AOD 134 metres\nEach exhaust gas emission flue stack (part of numbered work 1A)\n50 metres\n–\n–\nMaximum height AOD 149 metres Maximum diameter 6.5 metres\nSteam turbine building (part of numbered work 1A)\n21 metres\n26 metres\n45 metres\n–\nAir cooled condenser (part of numbered work 1A)\n26 metres\n48 metres\n48 metres\n–\nSwitchgear room (part of numbered work 1A)\n5 metres\n10 metres\n15 metres\n–\nRaw/fire water storage tank (part of numbered work 1B)\n20 metres\n–\n–\nMaximum diameter 15 metres\nEach water storage tank (part of numbered work 1B)\n20 metres\n–\n–\nMaximum diameter 5 metres\nWater treatment system (part of numbered work 1B)\n10 metres\n25 metres\n20 metres\n–\nWorkshop (part of numbered work 1B)\n10 metres\n20 metres\n30 metres\n–\nNatural gas pressure regulating installation (PRI) (part of numbered work 1B)\n5 metres\n25 metres\n35 metres\n–\nAdministration/ control building (part of numbered work 1C)\n10 metres\n10 metres\n20 metres\n–\nHeat network interface building (part of numbered work 1C)\n15 metres\n20 metres\n30 metres\n–\nEach transformer compound (part of numbered work 1D)\n8 metres\n15 metres\n15 metres\n–\n132kV switchyard (part of work numbered 1D)\n10 metres\n42 metres\n72 metres\n–\nPerimeter fencing (part of numbered work 1E)\n2.5 metres\n–\n770 metres\n–\nTable 3\n(1)\nElement of authorised development\n(2)\nMaximum height\n(metres) above the existing site level\n(3)\nMaximum width\n(metres)\n(4)\nMaximum length\n(metres)\n(5)\nOther parameters\nAbove Ground Installation (numbered work 2A)\n2.5 metres\n13 metres\n13 metres\n–\nPipeline inspection gauge facility (part of numbered work 2A)\n1.6 metres\n1 metre\n5.5 metres\n–\nPerimeter fencing (part of numbered work 2A)\n2.5 metres\n–\n52 metres\n–\nPipeline support plinth including crown of pipe (part of numbered work 2B)\n2 metres\n0.8 metres\n1.4 metres\n–\n(3) To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.\n(4) Numbered works 1, 2 and 4 may not commence until, for that numbered work, written details have been submitted to and approved by the relevant planning authority (in consultation with the National Trust regarding the external appearance and the colour of all permanent buildings and structures) concerning—\n(a) the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and\n(b) the colour, materials and surface finishes of the pipeline and all permanent buildings and structures.\n(5) The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 3 in force at 2.8.2016, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2016/779/schedule/2/paragraph/3",
    "retrieved_at": "2026-10-28T23:21:25.297730+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}