# The Meaford Gas Fired Generating Station Order 2016, Paragraph 3: Detailed design

Extent: E+W+S

(1) The authorised development must be carried out in accordance with—
(a) the approved plans listed in Table 1 below inclusive of any limits of deviation; and
(b) any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 19(1))—
Table 1
works plans
Submission document reference number 2.3
access rights of way plan
Submission document reference number 2.4
(2) The authorised development must not exceed the maximum parameters specified in Table 2 and Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 19(1))—
Table 2
(1)
Element of authorised development
(2)
Maximum height
(metres) above a site level of approximately 99 metres AOD
(3)
Maximum width
(metres)
(4)
Maximum length
(metres)
(5)
Other parameters
Gas turbine building (part of numbered work 1A)
25 metres
45 metres
60 metres
Maximum height 124m AOD
Each Heat Recovery Steam Generator Building (part of numbered work 1A)
35 metres
13 metres
25 metres
Maximum height AOD 134 metres
Each exhaust gas emission flue stack (part of numbered work 1A)
50 metres
–
–
Maximum height AOD 149 metres Maximum diameter 6.5 metres
Steam turbine building (part of numbered work 1A)
21 metres
26 metres
45 metres
–
Air cooled condenser (part of numbered work 1A)
26 metres
48 metres
48 metres
–
Switchgear room (part of numbered work 1A)
5 metres
10 metres
15 metres
–
Raw/fire water storage tank (part of numbered work 1B)
20 metres
–
–
Maximum diameter 15 metres
Each water storage tank (part of numbered work 1B)
20 metres
–
–
Maximum diameter 5 metres
Water treatment system (part of numbered work 1B)
10 metres
25 metres
20 metres
–
Workshop (part of numbered work 1B)
10 metres
20 metres
30 metres
–
Natural gas pressure regulating installation (PRI) (part of numbered work 1B)
5 metres
25 metres
35 metres
–
Administration/ control building (part of numbered work 1C)
10 metres
10 metres
20 metres
–
Heat network interface building (part of numbered work 1C)
15 metres
20 metres
30 metres
–
Each transformer compound (part of numbered work 1D)
8 metres
15 metres
15 metres
–
132kV switchyard (part of work numbered 1D)
10 metres
42 metres
72 metres
–
Perimeter fencing (part of numbered work 1E)
2.5 metres
–
770 metres
–
Table 3
(1)
Element of authorised development
(2)
Maximum height
(metres) above the existing site level
(3)
Maximum width
(metres)
(4)
Maximum length
(metres)
(5)
Other parameters
Above Ground Installation (numbered work 2A)
2.5 metres
13 metres
13 metres
–
Pipeline inspection gauge facility (part of numbered work 2A)
1.6 metres
1 metre
5.5 metres
–
Perimeter fencing (part of numbered work 2A)
2.5 metres
–
52 metres
–
Pipeline support plinth including crown of pipe (part of numbered work 2B)
2 metres
0.8 metres
1.4 metres
–
(3) To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.
(4) Numbered works 1, 2 and 4 may not commence until, for that numbered work, written details have been submitted to and approved by the relevant planning authority (in consultation with the National Trust regarding the external appearance and the colour of all permanent buildings and structures) concerning—
(a) the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and
(b) the colour, materials and surface finishes of the pipeline and all permanent buildings and structures.
(5) The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.

---
Source: https://www.legislation.gov.uk/uksi/2016/779/schedule/2/paragraph/3 (the official version)
Page: https://openlegislation.uk/meaford-gas-fired-generating-station-order-2016/schedule-2/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.