# The Meaford Gas Fired Generating Station Order 2016, Schedule 5: STREETS SUBJECT TO STREET WORKS

Extent: E+W+S

Table 5
(1)
Area
(2)
Streets subject to street works
(3)
Description of street works
In the Borough of Stafford
Meaford Road
Street works to facilitate the replacement, maintenance and/or refurbishment of the existing surface water drainage pipe in relation to numbered work 6 between lines E-F and G-H as shown on the access rights of way plan
In the Borough of Stafford
Northern Access Road
Street works to upgrade the existing access (the bellmouth of the Northern Access Road with Meaford Road as shown between line A-B on the access rights of way plan) and to upgrade and widen the Northern Access Road between line A-B and points C and D on the access rights of way plan

---
Source: https://www.legislation.gov.uk/uksi/2016/779/schedule/5 (the official version)
Page: https://openlegislation.uk/meaford-gas-fired-generating-station-order-2016/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.