# Measuring Equipment (Liquid Fuel and Lubricants) Regulations (Northern Ireland) 1998, Regulation 11: Pre-testing requirements for measuring equipment with discharge hoses

Extent: N.I.
Status: prospective

(1) Subject to paragraph (2), before testing any measuring equipment fitted with a discharge hose, the inspector shall ensure that test liquid has first been passed through the equipment.
(2) This regulation shall not apply to equipment used for the measurement of liquid fuel where the delivery system remains permanently full up to the outer extremity of the discharge hose.
(3) In this regulation “hose” includes rigid pipe work.

---
Source: https://www.legislation.gov.uk/nisr/1998/113/regulation/11 (the official version)
Page: https://openlegislation.uk/measuring-equipment-liquid-fuel-and-lubricants-regulations-northern-ireland-1998/regulation-11
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

