# The Measuring Instruments (EC Requirements) (Electrical Energy Meters) (Amendment) Regulations 2002, Paragraph 5


In Schedule 1, after paragraph 5, add—
“6 If an examination of the pattern or, as the case may be, the modifications or additions proposed to a pattern in respect of which EC pattern approval is in force, has been conducted by a nominated laboratory, a certified examination report.”

---
Source: https://www.legislation.gov.uk/uksi/2002/3082/schedule/paragraph/5 (the official version)
Page: https://openlegislation.uk/measuring-instruments-ec-requirements-electrical-energy-meters-amendment-regulations-2002/schedule/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

