Changes to Measuring Instruments (EC Requirements) (Electrical Energy Meters) 1995
S.I. 1995/2607
Made by Measuring Instruments (EC Requirements) (Electrical Energy Meters) 2002
5 changes. All changes to Measuring Instruments (EC Requirements) (Electrical Energy Meters) 1995
| Provision | Change | Made by | In force |
|---|---|---|---|
| reg 5A | added (1.2.2003) | regs 3, 4, Schedule, para 3 | — |
| reg 5 | am (1.2.2003) | regs 3, 4, Schedule, para 2 | — |
| reg 10 | subst (1.2.2003) | regs 3, 4, Schedule, para 4 | — |
| Sch 1, para 6 | added (1.2.2003) | regs 3, 4, Schedule, para 5 | — |
| reg 2 defn(s) | added (1.2.2003) | regs 3, 4, Schedule, para 1 | — |
From legislation.gov.uk's record of changes, the official one: see it there.