Paragraph 1
Three sample meters having such basic current and reference voltage as the Director, upon examination of the tables referred to in paragraph 2 below, may select.
Three sample meters having such basic current and reference voltage as the Director, upon examination of the tables referred to in paragraph 2 below, may select.