# The Measuring Instruments (EC Requirements) (Electrical Energy Meters) Regulations 1995, Paragraph 3


A drawing of the relevant instrument, showing the position intended for the seal of EC initial verification, and drawings of the following components: base, handle and fixing points; cover; terminal plate and cover; driving element; windings and air gaps; breaking element and method of adjustment; register; rotor; upper and lower rotor bearings; temperature compensating devices; overload compensating devices; inductive load adjustment; light load adjustment; auxiliary circuits; and rating plate.

---
Source: https://www.legislation.gov.uk/uksi/1995/2607/schedule/1/paragraph/3 (the official version)
Page: https://openlegislation.uk/measuring-instruments-ec-requirements-electrical-energy-meters-regulations-1995/schedule-1/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

