{
  "url": "https://openlegislation.uk/measuring-instruments-ec-requirements-electrical-energy-meters-regulations-1995/schedule-2/paragraph-2",
  "json_url": "https://openlegislation.uk/measuring-instruments-ec-requirements-electrical-energy-meters-regulations-1995/schedule-2/paragraph-2.json",
  "legislation": "uksi/1995/2607",
  "legislation_title": "The Measuring Instruments (EC Requirements) (Electrical Energy Meters) Regulations 1995",
  "legislation_url": "https://openlegislation.uk/measuring-instruments-ec-requirements-electrical-energy-meters-regulations-1995",
  "path": "schedule/2/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Single stage of EC initial verification",
  "text": "EC initial verification of any relevant instrument shall be carried out in one stage; and the electricity meter examiner carrying out such initial verification shall comply with the requirements of the Directive on electrical energy meters as to the manner in which initial verification of relevant instruments shall be conducted.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/1995/2607/schedule/2/paragraph/2",
    "retrieved_at": "2026-10-29T13:00:30.629442+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}