Schedule 2
In this Schedule, the abbreviation employed to refer to the kilogramme unit of measurement is kg.
| NOTE – previous fees in brackets | £ | |
|---|---|---|
A. Weighing Instruments – | ||
(1) subject to single EC verification, each instrument or (if fitted with two or more weigh tables or platforms connected to one or more indicating mechanisms), each weigh table or platform – | ||
| capacity as marked on the machine – | ||
| not exceeding 100 kg | 21.00 | (18.00) |
| exceeding 100 kg but not exceeding 1,000 kg | 47.00 | (41.00) |
| exceeding 1,000 kg but not exceeding 5,000 kg | 112.00 | (98.00) |
| exceeding 5,000 kg but not exceeding 30,000 kg | 242.00 | (212.00) |
| exceeding 30,000 kg | 364.00 | (319.00) |
(2) subject to two stages of EC verification, each stage verification | 50 per cent of the fee which would be payable if the weighing instrument were only subject to a single stage EC verification | |
B. Otherwise, each verification – | ||
| per man/hour spent at the place of verification | Inspector rate 36.00 | (32.00) |
| Assistant rate 25.00 | (22.00) | |