Schedule 2
In this Schedule, the abbreviation employed to refer to the kilogramme unit of measurement is kg.
| NOTE – previous fees in brackets | £ | |
|---|---|---|
| A. Weighing Instruments — | ||
| (1) subject to single EC verification, each instrument or (if fitted with two or more weigh tables or platforms connected to one or more indicating mechanisms), each weigh table or platform — | ||
| capacity as marked on the machine — | ||
| not exceeding 100 kg | 24.00 | (23.00) |
| exceeding 100 kg but not exceeding 1,000 kg | 51.50 | (50.00) |
| exceeding 1,000 kg but not exceeding 5,000 kg | 122.00 | (118.00) |
| exceeding 5,000 kg but not exceeding 30,000 kg | 266.50 | (258.00) |
| exceeding 30,000 kg | 398.50 | (386.00) |
| (2) subject to two stages of EC verification, each stage verification | 50 per cent of the fee which would be payable if the weighing instrument were only subject to a single stage EC verification | |
| B. Otherwise, each verification — | ||
| per man/hour spent at the place of verification | Inspector rate 39.00 | (38.00) |
| Assistant rate 28.00 | (27.00) | |