# The Measuring Instruments Regulations 2016, Paragraph 10: Putting into Use


The requirements under paragraphs 1, 2 and 3 are determined by the utility or the person legally designated for installing the meter, so that the meter is appropriate for the accurate measurement of consumption that is foreseen or foreseeable.
CONFORMITY ASSESSMENT The conformity assessment procedures specified in the modules in Schedule 1B applicable to water meters that the manufacturer can choose between are:
(a) B and F;
(b) B and D; or
(c) H1.

---
Source: https://www.legislation.gov.uk/uksi/2016/1153/schedule/1C/paragraph/10 (the official version)
Page: https://openlegislation.uk/measuring-instruments-regulations-2016/schedule-1C/paragraph-10
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

