# The Medworth Energy from Waste Combined Heat and Power Facility (Correction) Order 2024, Introduction: Introductory text


Infrastructure Planning
Made 7th November 2024
Coming into force 8th November 2024
The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (“the Order”), which granted development consent within the meaning of the Planning Act 2008 (“the Act”), contains correctable errors within the meaning of paragraph 1 of Schedule 4 to the Act.
In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, before the end of the relevant period (as defined in paragraph 1(6)(a) of Schedule 4 to the Act), the Secretary of State received a written request from the applicant for the correction of errors in the Order.
In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State has informed Cambridgeshire County Council, Norfolk County Council, Fenland District Council and the Borough Council of King’s Lynn and West Norfolk as the relevant local planning authorities, that the request has been received.
The Secretary of State, in exercise of the powers conferred by section 119, and paragraphs 1(4) and 1(8) of Schedule 4 to the Act, makes the following Order—

---
Source: https://www.legislation.gov.uk/uksi/2024/1136/introduction (the official version)
Page: https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-correction-order-2024/introduction
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.