# The Medworth Energy from Waste Combined Heat and Power Facility Order 2024, Paragraph 43C


If in consequence of the exercise of the powers conferred by this Order the access to any apparatus is materially obstructed the undertaker must provide such alternative means of access to that apparatus as will enable EPN to maintain or use the apparatus no less effectively than was possible before the obstruction.

---