# The Medworth Energy from Waste Combined Heat and Power Facility Order 2024, Paragraph 48: General

Extent: E+W+S

References to any standards, manuals, contracts, regulations and directives including to specific standards forming part of the DMRB are, for the purposes of this Part of this Schedule, to be construed as a reference to the same as amended, substituted or replaced, and with such modifications as are required in those circumstances.

---
Source: https://www.legislation.gov.uk/uksi/2024/230/schedule/11/paragraph/48 (the official version)
Page: https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-11/paragraph-48
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

