# The Medworth Energy from Waste Combined Heat and Power Facility Order 2024, Paragraph 1: Interpretation

Extent: E+W+S

In this Schedule—
“relevant authority” means the relevant planning authority, Ministry of Defence, relevant highway authority, traffic authority, street authority, or the owner of a watercourse, sewer or drain as may be appropriate to the consent, agreement or approval sought; and
“requirement consultee” means any body named in a requirement as a body required to be consulted by the relevant authority in discharging that requirement.

---
Source: https://www.legislation.gov.uk/uksi/2024/230/schedule/12/paragraph/1 (the official version)
Page: https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-12/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

