{
  "url": "https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-13",
  "json_url": "https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-13.json",
  "legislation": "uksi/2024/230",
  "legislation_title": "The Medworth Energy from Waste Combined Heat and Power Facility Order 2024",
  "legislation_url": "https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024",
  "path": "schedule/13",
  "kind": "schedule",
  "number": "13",
  "heading": "DOCUMENTS AND PLANS TO BE CERTIFIED",
  "text": "Table 10\n(1)\nDocument name\n(2)\nDocument reference\n(3)\nRevision number\n(4)\nDate\naccess and public rights of way plans\n2.4\n7\nAugust 2023\nbook of reference\n4.1\n6\nAugust 2023\ncarbon capture and export embedded design measures\n14.7 (Appendix B)\n1\nJune 2023\ncarbon capture and export readiness reserve space plan\n10.7\n1\nMarch 2023\ncombined heat and power embedded design measures\n14.7 (Appendix A)\n1\nJune 2023\ncombined heat and power assessment\n7.6\n1\nJune 2022\ndesign and access statement\n7.5\n1\nJune 2022\nenvironmental statement\n6.1, 6.2\n2\nJune 2023\nenvironmental statement figures\n6.3\n2\nMay 2023\nenvironmental statement appendices\n6.4\n2\nMarch 2023\nflood risk assessment\n6.4 (ES Appendix 12A)\n1\nJune 2022\nland plans\n2.2\n5\nAugust 2023\noutline biodiversity net gain strategy\n6.4 (ES Appendix 11M)\n5\nJuly 2023\noutline construction environmental management plan\n7.12\n6\nJuly 2023\noutline construction traffic management plan\n6.4 (ES Appendix 6A)\n7\nAugust 2023\noutline decommissioning plan\n12.4\n1\nMay 2023\noutline drainage strategy\n6.4 (ES Appendix 12F)\n4\nAugust 2023\noutline employment and skills strategy\n7.8\n1\nJune 2022\noutline fire prevention plan\n7.10\n3\nAugust 2023\noutline flood emergency management plan\n7.9\n2\nMarch 2023\noutline landscape and ecology strategy\n6.3 (ES Figure 3.14)\n2\nMarch 2023\noutline landscape and ecology management plan\n7.7\n2\nApril 2023\noutline lighting strategy\n6.4 (ES Appendix 3B)\n3\nJune 2023\noutline local air quality monitoring strategy\n9.21\n3\nMay 2023\noutline odour management plan\n7.11\n3\nAugust 2023\noutline operational noise management plan\n6.4 (ES Appendix 7D)\n4\nJune 2023\noutline operational traffic management plan\n7.15\n4\nJuly 2023\noutline operational travel plan\n6.4 (ES Appendix 6C)\n1\nJune 2022\nwaste area plan\n15.9\n1\nJuly 2023\nworks plans\n2.3\n4\nAugust 2023",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 13 Table 10 substituted (8.11.2024) by The Medworth Energy from Waste Combined Heat and Power Facility (Correction) Order 2024 (S.I. 2024/1136), art. 1(2), Sch. 1"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 13 Table 10 substituted (8.11.2024) by The Medworth Energy from Waste Combined Heat and Power Facility (Correction) Order 2024 (S.I. 2024/1136), art. 1(2), Sch. 1"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 13 in force at 13.3.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/230/schedule/13",
    "retrieved_at": "2026-10-28T21:34:06.934543+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}