# The Medworth Energy from Waste Combined Heat and Power Facility Order 2024, Schedule 13: DOCUMENTS AND PLANS TO BE CERTIFIED

Extent: E+W+S

Table 10
(1)
Document name
(2)
Document reference
(3)
Revision number
(4)
Date
access and public rights of way plans
2.4
7
August 2023
book of reference
4.1
6
August 2023
carbon capture and export embedded design measures
14.7 (Appendix B)
1
June 2023
carbon capture and export readiness reserve space plan
10.7
1
March 2023
combined heat and power embedded design measures
14.7 (Appendix A)
1
June 2023
combined heat and power assessment
7.6
1
June 2022
design and access statement
7.5
1
June 2022
environmental statement
6.1, 6.2
2
June 2023
environmental statement figures
6.3
2
May 2023
environmental statement appendices
6.4
2
March 2023
flood risk assessment
6.4 (ES Appendix 12A)
1
June 2022
land plans
2.2
5
August 2023
outline biodiversity net gain strategy
6.4 (ES Appendix 11M)
5
July 2023
outline construction environmental management plan
7.12
6
July 2023
outline construction traffic management plan
6.4 (ES Appendix 6A)
7
August 2023
outline decommissioning plan
12.4
1
May 2023
outline drainage strategy
6.4 (ES Appendix 12F)
4
August 2023
outline employment and skills strategy
7.8
1
June 2022
outline fire prevention plan
7.10
3
August 2023
outline flood emergency management plan
7.9
2
March 2023
outline landscape and ecology strategy
6.3 (ES Figure 3.14)
2
March 2023
outline landscape and ecology management plan
7.7
2
April 2023
outline lighting strategy
6.4 (ES Appendix 3B)
3
June 2023
outline local air quality monitoring strategy
9.21
3
May 2023
outline odour management plan
7.11
3
August 2023
outline operational noise management plan
6.4 (ES Appendix 7D)
4
June 2023
outline operational traffic management plan
7.15
4
July 2023
outline operational travel plan
6.4 (ES Appendix 6C)
1
June 2022
waste area plan
15.9
1
July 2023
works plans
2.3
4
August 2023

---
Source: https://www.legislation.gov.uk/uksi/2024/230/schedule/13 (the official version)
Page: https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-13
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.