  "url": "https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-14",
  "json_url": "https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-14.json",
  "legislation": "uksi/2024/230",
  "legislation_title": "The Medworth Energy from Waste Combined Heat and Power Facility Order 2024",
  "legislation_url": "https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024",
  "path": "schedule/14",
  "kind": "schedule",
  "number": "14",
  "heading": "MAXIMUM AND MINIMUM DESIGN PARAMETERS",
  "text": "Table 11\n(1)\nElement of authorised development\n(2)\nWork No.\n(3)\nMaximum length (metres)\n(4)\nMaximum width (metres)\n(5)\nMaximum height (metres) (above finished floor level of 3.0m AOD)\n(6)\nMinimum height (metres) (above finished floor level of 3.0m AOD)\nGatehouse / weighbridge\n2A\n9.5\n2.4\n3\nTipping hall\n1\n58.5\n38\n18.5\nFire water tank\n2A\n16\n10\nFire water pump building\n2A\n12.5\n9.5\n5.5\nWaste bunker building\n1\n102\n37\n38.5\nTipping bunker\n1\n–\n–\n-14\nMain waste bunker\n1\n–\n–\n-14\nBoiler house building\n1\n55\n47.6\n52\nLoading area (a)\n1\n12.2\n12.2\n12\nAPCr silos\n1\n33.3\n12.2\n37\nLoading area (b)\n1\n12.2\n12.2\n12\nAir pollution control building\n1\n33.2\n28.6\n37\nInduced draft fans building\n1\n10\n10\n12\nChimneys\n1A\n–\n3.2\n90\n84\nCEMS platform\n1A\n–\n–\n18\nSwitchgear building north\n1\n35.2\n10\n35\nSwitchgear building south\n1\n12.4\n10\n18\nIBA enclosure east\n1\n14\n11\n12\nIBA enclosure west\n1\n11\n6\n12\nDiesel tanks and urea tanks building\n1\n25.9\n9.1\n35\nCompressed air station\n1\n13\n8\n10\nMain transformer\n2A\n11\n6\n12\nEmergency diesel generator\n1\n13.5\n5.5\n12\nAir cooled condenser\n1\n37\n37\n30\nTurbine hall\n1\n47\n34\n27\nWater treatment plant\n1\n30\n22\n18\nWorkshop and stores\n2A\n34\n15\n18\nAdministration building\n1B\n34\n12\n15\n132kV switching compound\n2A\n23\n13\n6.5\nPrivate wire transformer\n2A\n11\n5\n12\nPrivate wire switchgear compound\n2A\n7\n6\n12\nWater re–cooling system\n1\n18.5\n7.5\n27\nSteam and condensate pipelines\n3\n–\n–\n23",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 14 in force at 13.3.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/230/schedule/14",
    "retrieved_at": "2026-10-28T21:34:06.934543+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}