# The Medworth Energy from Waste Combined Heat and Power Facility Order 2024, Schedule 14: MAXIMUM AND MINIMUM DESIGN PARAMETERS

Extent: E+W+S

Table 11
(1)
Element of authorised development
(2)
Work No.
(3)
Maximum length (metres)
(4)
Maximum width (metres)
(5)
Maximum height (metres) (above finished floor level of 3.0m AOD)
(6)
Minimum height (metres) (above finished floor level of 3.0m AOD)
Gatehouse / weighbridge
2A
9.5
2.4
3
Tipping hall
1
58.5
38
18.5
Fire water tank
2A
16
10
Fire water pump building
2A
12.5
9.5
5.5
Waste bunker building
1
102
37
38.5
Tipping bunker
1
–
–
-14
Main waste bunker
1
–
–
-14
Boiler house building
1
55
47.6
52
Loading area (a)
1
12.2
12.2
12
APCr silos
1
33.3
12.2
37
Loading area (b)
1
12.2
12.2
12
Air pollution control building
1
33.2
28.6
37
Induced draft fans building
1
10
10
12
Chimneys
1A
–
3.2
90
84
CEMS platform
1A
–
–
18
Switchgear building north
1
35.2
10
35
Switchgear building south
1
12.4
10
18
IBA enclosure east
1
14
11
12
IBA enclosure west
1
11
6
12
Diesel tanks and urea tanks building
1
25.9
9.1
35
Compressed air station
1
13
8
10
Main transformer
2A
11
6
12
Emergency diesel generator
1
13.5
5.5
12
Air cooled condenser
1
37
37
30
Turbine hall
1
47
34
27
Water treatment plant
1
30
22
18
Workshop and stores
2A
34
15
18
Administration building
1B
34
12
15
132kV switching compound
2A
23
13
6.5
Private wire transformer
2A
11
5
12
Private wire switchgear compound
2A
7
6
12
Water re–cooling system
1
18.5
7.5
27
Steam and condensate pipelines
3
–
–
23

---
Source: https://www.legislation.gov.uk/uksi/2024/230/schedule/14 (the official version)
Page: https://openlegislation.uk/medworth-energy-from-waste-combined-heat-and-power-facility-order-2024/schedule-14
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.