# The Merchant Shipping (International Load Line Convention) (Amendment) Regulations 2018, Regulation 13: Maintenance of conditions after survey

Extent: E+W+S+N.I.

The owner and master must ensure that after completion of any survey required under regulation 12, no material alteration is made to the ship, its structure, equipment, arrangements, material or scantlings covered by the survey without the approval of the Assigning Authority that issued the Convention certificate.

---
Source: https://www.legislation.gov.uk/uksi/2018/155/regulation/13 (the official version)
Page: https://openlegislation.uk/merchant-shipping-international-load-line-convention-amendment-regulations-2018/regulation-13
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

