# The Merchant Shipping (Life-Saving Appliances for Passenger Ships of Classes III to VI (A)) Regulations 1992, Paragraph 5.6: Lifting Arrangements


The bridle sling lifting arrangements shall be proof tested to not less than 4 times their respective working loads. The proof testing can be carried out either:
5.6.1 individually on each item associated with the lifting arrangements; or
5.6.2 on the assembly of a structurally completed boat with its lifting arrangements and particular bridle sling. In each case fabric webbings and cordages forming part of the lifting arrangements shall have a breaking strength of not less than six times their respective working loads.

---
Source: https://www.legislation.gov.uk/uksi/1992/2359/schedule/3/paragraph/5.6 (the official version)
Page: https://openlegislation.uk/merchant-shipping-life-saving-appliances-for-passenger-ships-of-classes-iii-to-vi-a-regulations-1992/schedule-3/paragraph-5.6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

