Paragraph 2.3 Construction
The boarding platform shall:
be stable in a seaway and provide a safe working area for the system operators;
be self draining;
be sub-divided in such a way that the loss of gas from any one compartment will not restrict its operational use as a means of evacuation;
be capable of supporting twice the number of persons carried in the largest inflatable liferaft associated with the system;
be consructed in accordance with the buoyancy and floor area parameters stated in Part I of Schedule 4;
be fitted with stabilising waterpockets designed in accordance with the standards stated in Part I of Schedule 4;
be restrained by a bowsing line which is designed to deploy automatically as the system inflates, to prevent it drifting to a position where it would be deployed at an angle of more than 45° to the ship’s side;
be provided with mooring and bowsing line patches of sufficient strength to tie off the largest inflatable liferaft associated with the system; and
be provided with a means of quick release from the chute, and if intended for use as an inflatable liferaft, comply with the appropriate requirements of Part I of Schedule 4.