Article 3 Power to construct works
Subject to the provisions of this Order, the Company may in the port and in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plan and sections construct and maintain the works hereafter described, together with all necessary and proper works and conveniences connected with or incidental thereto, that is to say—
-
Work No. 1.—A rock berm along the toe of the river wall over a length of 310 metres commencing at a point at 332760, 394741 proceeding thence in a southerly direction, terminating at a point at 332894, 394462.
-
Work No. 2.—An approach bridge of structural steelwork and/or reinforced concrete deck on tubular piles to the second deck of the linkspan, commencing at a point on the quay edge, at a point at 332876, 394513, proceeding thence in a south westerly direction for 40 metres and terminating at a point at 332867, 394487.
-
Work No. 3.—An approach bridge of structural steelwork and/or reinforced concrete deck on tubular piles to the first deck of the linkspan, commencing at a point on the quay edge, at a point at 332896, 394490, proceeding thence in a westerly direction for 35 metres and terminating at a point at 332869, 394471.
-
Work No. 4.—A twin deck linkspan providing berth and associated facilities for vessels including a series of dolphins of structural steelwork and/or reinforced concrete deck on tubular piles, with interlinking walkways commencing at the termination of Work No. 2 (332867, 394487) proceeding thence in a south westerly direction for 325 metres and terminating at a point at 332903, 394163.
The Company may within the limits of deviation alter, replace, relay or reconstruct the works and may maintain the same as altered, replaced, relaid or reconstructed.