# The Merseytram (Liverpool City Centre to Kirkby) Order 2005, Schedule 4: STREETS SUBJECT TO ALTERATION OF LAYOUT


(1)
(2)
Street subject to alteration of layout
Description of alteration
In the City of Liverpool
Gower Street
Realign street to south between RS1 and RS2.
Modify kerb layout to modify car park entrance at WE1 and WE2.
Salthouse Quay
Modify kerb layout at WE3 to tie in with Gower Street realignment.
Wapping
Realign street between RS3 and RS4.
Bring the west kerb of the northbound carriageway out into the road between NS1 and NS2.
Liver Street
Set back the north side kerbs between WS1 and WS2 to widen street.
Realign street between RS5 and RS6.
Paradise Street
Realign street between Park Lane and Price Street junction, between RS7 and RS8, to create a new passage.
Modify the kerb on the entry to Cleveland Square/exit from Paradise Street at WE4.
Cleveland Square
Create new way between NP1 and NP2.
Hanover Street
Realign street between Canning Place at RS9 and Manesty’s Lane at RS10.
Realign footway between FS1 and FS2 to west to run parallel to tram alignment.
Strand Street
Modify the kerbs from the head of Hartley Quay between WE5 along Strand Street to WE5A.
Mann Island
Realign Mann Island between RS11 and RS12.
Modify the island at WE6 on the north-western corner of Mann Island and southern end of George’s Pierhead to create turning head.
Goree and The Strand
Realign junctions at RS13 and RS14.
Extend the kerb at WE7 to tie James Street kerb line in with new alignment of The Strand.
Water Street
Narrow street between NS3 and NS4.
Set south kerbs forward to create space for tram alignment.
Realign the street between RS15 and RS16 to tie in with tram alignment.
Set the north side kerbs forward, between NS5 and NS6.
Modify the kerb line at WE8 and WE9 to channel traffic across tram alignment.
Exchange Street East
Bring east side kerb forward between NS7 and NS8.
Dale Street
Realign Dale Street between RS17 and RS18.
Narrow Dale Street between NS9 and NS10.
Modify kerbline at WE10 and WE10A to link Exchange Passage West and Exchange Street West, and Exchange Passage East.
Extend the kerb at WE11, Moorfields and Dale Street junction.
Realign the kerb at WE12, Crosshall Street and Dale Street junction.
Realign between RS19 and RS20.
Victoria Street
Realign junction with Crosshall Street at RS21.
Realign junction with Sir Thomas Street at RS22.
Whitechapel
Realign Whitechapel between Sir Thomas Street at RS23 and The Observatory at RS24.
Old Haymarket & Byrom Street
Completely realign the highway including junctions between RS25 and RS26 including Victoria Street, Old Haymarket and Byrom Street.
St John’s Lane & St George’s Place
Realign St George’s Place between RS27 and RS28.
William Brown Street
Modify the kerb between WE13 and WE14.
Remove the pavement at NP9.
Create a new way between NP10 and NP11.
Create disabled parking bays at PB3 and PB4.
Lime Street
Realign between RS29 and onto Commutation Row at RS30.
Convert dual carriageway to single carriageway.
Narrow the street between NS11 and NS12.
Commutation Row
Narrow the street between NS13 and NS14.
Churchill Way
Widen the road between WS3 and WS4 at eastern entrance/exit to Churchill Way.
Cuerden Street
Create parking bays (including bus laybys) between PB1 and PB2.
Realign between RS31 and RS32.
London Road
Realign between RS33 and RS34 to run two way traffic along north-westbound carriageway.
Realign between Stafford Street at RS35, and onto Prescot Street, just north of Royal Liverpool University Hospital at RS36.
Realign footway between FS3 and FS4 to north to run parallel to tramway alignment.
Anson Street
Narrow street at NS14A.
Norton Street
Widen street between WS5 and WS5A.
Shepherd Street
Modify kerbline between WE15 and WE15A.
Erskine Street
Realign kerbs along the link road to Brunswick Road between RS37 and RS38.
Create new way between NP22 and NP23.
Brunswick Road
Realign the road between RS39 and RS40 to accommodate tram alignment to north.
Realign the road between RS98 and RS99.
Narrow the road between NS15 and NS16, bring north kerb forwards.
Realign footway between FS5 and FS6 to north-west to run parallel to tram alignment.
West Derby Road
Realign the road between RS41 and RS42.
Realign between RS43 and RS44.
Realign the road between RS45 and RS46.
Realign the road between RS47 and RS48.
Realign the road from RS49 to RS50.
Realign the road between RS51 and RS52.
Run traffic either side of tram alignment.
Eastbound, north kerb, create parking spaces between PB7 and PB8, PB9 and PB10, PB11 and PB12, PB13 and PB14, and PB15 and PB16.
Eastbound, south kerb, create parking spaces between PB17 and PB18, PB19 and PB20, and PB21 and PB22.
Westbound, north kerb, create parking spaces between PB23 and PB24, and PB25 and PB26.
Westbound, south kerb, create parking spaces between PB27 and PB28, PB29 and PB30, and PB31 and PB32.
Modify kerb from WE16 to WE17.
Walker Street
Modify the kerbs at WE18 and WE19 to improve entrance radii.
Perth Street
Modify kerb line at WE20 to provide a turning head.
Boundary Lane
Modify the entry and exit kerb radii at WE21 and WE22 at junction of Boundary Lane and West Derby Road.
Rocky Lane
Set the kerbs back between WS6 and WS7 to widen entrance to Rocky Lane.
Sheil Road
Reduce the kerb radii on the entrance/exit to Sheil Road at WE23 and WE24.
Lisburn Lane
Increase the size of the traffic island at the head of Lisburn Lane at WE25.
Queen’s Drive West Derby
Realign the junction with Muirhead Avenue between RS53 and RS54.
Narrow the north-westbound carriageway between NS17 and NS18.
Realign the carriageway between Muirhead Avenue from RS55 to Townsend Lane at RS56 (Queen’s Drive West Walton).
Widen the road on the north-westbound carriageway between WS8 to WS9.
Townsend Avenue
Realign the carriageway between RS57 and RS58.
Reduce the length of the central reservation at WE26.
Completely realign junction between RS59 and RS60 at the junction of Townsend Avenue and Utting Avenue East.
Build out kerb at WE27 to tie in with realigned junction.
Build out kerb between WE28 and WE29 to tie in with realigned junction.
Utting Avenue East
Realign the entire junction of Utting Avenue East and Parthenon and Lorenzo Drives between RS61 and RS62.
Narrow the north-eastbound carriageway between NS19 and NS20.
Narrow the south-westbound carriageway between NS21 and NS22.
Narrow the north-eastbound carriageway between NS23 and NS24.
Narrow the south-westbound carriageway between NS25 and NS26.
Realign the entire junction of Utting Avenue East and Sedgemoor and Lewisham Roads between RS63 and RS64.
Narrow the north-eastbound carriageway between NS27 and NS28.
Narrow the south-westbound carriageway between NS29 and NS30.
Realign the entire junction of Utting Avenue East and Scargreen and Stalisfield Avenues between RS65 and RS66.
Narrow the north-eastbound carriageway between NS31 and NS32.
Narrow the south-westbound carriageway between NS33 and NS34.
Realign the entire junction between RS67 and RS68.
North-eastbound, create parking spaces between PB33 and PB34, PB35 and PB36, PB37 and PB38, PB45 and PB46, PB47 and PB48, PB49 and PB50, PB57 and PB58, PB61 and PB62, PB63 and PB64, PB65 and PB66, PB67 and PB68, PB69 and PB70, PB79 and PB80, PB81 and PB82, PB83 and PB84, PB85 and PB86, PB87 and PB88, and PB89 and PB90.
South-westbound, create parking spaces between PB39 and PB40, PB41 and PB42, PB43 and PB44, PB51 and PB52, PB53 and PB54, PB55 and PB56, PB59 and PB60, PB71 and PB72, PB73 and PB74, PB75 and PB76, PB77 and PB78, PB91 and PB92, PB93 and PB94, PB95 and PB96, PB97 and PB98, and PB99 and PB100.
Storrington Avenue
Set back the kerbs on the north-eastbound carriageway between WS10 and WS11.
Set back the kerbs on the south-westbound carriageway between WS12 and WS13.
Realign the junction of Storrington Avenue and Stonebridge Lane at RS69.
East Lancashire Road and Back Gillmoss Lane
Modify kerb between WE30 and WE30A.
Stonebridge Lane
Realign footway between FS7 and FS8 to east to run parallel to tram alignment.
East Lancashire Road
Re-model junction of Stonebridge Lane and East Lancashire Road at RS70.
Modify kerb between WE32 and WE33.
Realign footpath between FS16A and FS16B.
In the Metropolitan Borough of Knowsley
Modify the kerb at WE45 and WE46 to provide slips to accesses at Shrog’s Farm and Radshaw Nook.
Realign M57 sliproad between RS73 and RS74.
Realign footway between FS17 and FS18 to south to run parallel to tram alignment.
Ribbler’s Lane
Realign the slip road between RS75 and RS76.
Moorgate Road
Realign footway between FS9 and FS10 to north-west to run parallel to tram alignment.
Realign footway between FS11 and FS12 to north-west to run parallel to tram alignment.
Modify the traffic island at WE34 at the junction of Moorgate Road and Ribbler’s Lane.
Realign the highway between RS77 and RS78 including the creation of new bus laybys.
Realign the road between RS79 and RS80 to enable tram lines to be run along west side of Moorgate Road including the creation of bus laybys.
Modify the kerb radii at WE35 at junction of Moorgate Road and Bewley Drive.
Reduce kerb radii to take the exit from Bewley Drive WE36.
Modify the kerb line between WE47 and WE48 to provide new turning head for Shaldon Close.
Realign between RS81 and RS82, Tokenspire Park to Britonside Avenue including the creation of new bus laybys.
Realign between RS83 and RS84, Britonside Avenue to Moorgate Road including the creation of new bus laybys.
Modify the kerb radii at WE37 at the junction with Britonside Avenue.
Reduce kerb radii at WE38 to channel traffic across tram lines.
Realign the road from RS85 to RS86, Knowsley Industrial Park to County Road including the creation of new bus laybys.
Create a layby between PB101 and PB102.
County Road
Realign the eastern side of the Broad Lane roundabout at RS87 including entrance radii into Broad Lane.
Realign from RS88 to RS89, from County Road roundabout to Park Brow Drive, including the creation of new bus laybys.
Modify the kerb radii at WE39, at junction with Park Brow Drive.
Reduce kerb radii to take the exit from Park Brow Drive at WE40.
Create a new traffic island at WE41.
Realign the road between RS90 and RS91.
Realign the road between RS92 and RS93.
Webster Drive
Realign the entire street, between RS94 and RS95.
Realign footway between FS13 and FS14 to north-west to run parallel to tram alignment.
Extend the kerbline outwards at WE42.
Cherryfield Drive
Modify the kerb layout at the head of Webster Road at WE44.
Modify the kerb layout at entrance to South Parade at WE45.
Realign the road between RS96 and RS97 to allow trams and motor vehicles to use same section of road.
Narrow the road between NS37 and NS38.
St Chad’s Drive
Modify the kerbline at WE43.

---
Source: https://www.legislation.gov.uk/uksi/2005/120/schedule/4 (the official version)
Page: https://openlegislation.uk/merseytram-liverpool-city-centre-to-kirkby-order-2005/schedule-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

