Regulation 4 Application for approval
(1)
Any person who requires the pattern or construction of a meter to be approved shall submit to the Director—
(a)
an application containing the information specified in the Schedule to these Regulations and signed by that person; and
(b)
not less than three meters of the pattern or construction for which approval is required.
(2)
References in this regulation to the pattern or construction of a meter include references to a modification of a pattern or construction which has previously been approved in accordance with these Regulations.