OpenLegislation

Article 2 Interpretation

Original text. Later amendments are not shown.

In this Order—

  • “single-phase credit meter” means an induction type alternating current single-phase two wire single rate credit meter;

  • “specified meter” means a static meter, a prepayment meter, a maximum demand meter or a multi-rate meter, being in each case an alternating current meter;

  • “the Schedule of 1899” means the Schedule to the Electric Lighting (Clauses) Act 1899f1, as incorporated with the Electricity Act 1947 and as amended, adapted and modifiedf2.

Annotations

Footnotes

f1

1899 c. 19.

f2

Section 50 of the Schedule of 1899 was substituted by the Electric Lighting Act 1909 (c. 34), section 11 and Second Schedule, and, as incorporated with the Electricity Act 1947 (c. 54), section 50 of the Schedule of 1899 was adapted and modified by the Electricity Act 1947 section 57(2) and Fourth Schedule, Part III, and by the Energy Act 1983 (c. 25), Schedule 1.